Non-Selling Labour in Retail: How to Plan Store Work Better

Written by: Ben Flikkema | Content Specialist at StoreForce

A store has six associates scheduled for Saturday afternoon. Two are processing a delivery, one is completing markdowns, and another is on break. Only two are available to help customers during the busiest part of the day.

The weekly schedule may be within budget. The headcount may look sufficient. The service gap becomes clear when leaders examine what those scheduled people are doing.

Non-selling labour is the time allocated to work outside direct customer service and selling. It includes receiving, stock processing, merchandising, administration, inventory counts, and opening or closing routines. These activities keep stores operating and support future sales. They also require capacity that must be accounted for in the labour plan.

For retail directors, the challenge is to understand how much time that work requires, when it needs to happen, and what coverage remains available for customers.

Bring Your Stores Together and Execute Better

Give your teams the workforce management tools to drive better results.

Speak to Our Team

Define what counts as non-selling work

Start with consistent activity definitions across stores. Without them, one location may record replenishment as selling time while another records the same work as non-selling. Comparisons will reflect differences in reporting as well as differences in operations.

Use categories that are specific enough to inform decisions and simple enough for managers to apply.

Activity

What drives the workload

What to account for

Receiving and stock processing

Delivery frequency, cartons, units, and handling requirements

Receiving, checking, unpacking, tagging, and putting stock away

Replenishment

Sales volume, stock movement, and storage layout

Time needed to restore availability on the floor

Merchandising and promotions

Displays, fixtures, signage, and assortment changes

Preparation, setup, price checks, and verification

Inventory work

Count scope, frequency, and discrepancies

Counting, investigation, and reconciliation

Opening and closing

Operating routines, format, and store size

Work before customers arrive and after they leave

Administration and training

Reporting requirements, team size, and development needs

Focused time and any coverage required while people participate

Some activities combine customer support and operational work. Decide how those situations will be treated and explain the rule. Useful reporting depends on consistent application.

Understand what a fixed allocation can hide

A fixed weekly pool of non-selling hours gives managers flexibility and keeps planning simple. It can work reasonably well where workload is stable and stores have similar requirements.

Its limitation is that it does little to explain changes.

A store receiving twice its normal delivery volume may still have the same allocation. Another may have a major reset while its peers have routine replenishment. Managers then have to absorb the additional work, delay it, or pull associates from customer-facing roles.

Activity-based planning makes those requirements visible by estimating hours for defined categories of work.

Planning approach

Where it helps

What needs attention

Fixed allocation

Stable, recurring work with predictable requirements

Whether the allowance still reflects actual workload

Activity-based allocation

Work that changes with volume, scope, or frequency

Whether the workload forecast and time assumptions are credible

Combined approach

Stores with routine duties and variable operational demand

Clear boundaries so activities are counted once

A practical model can provide a baseline for recurring routines and variable hours for deliveries, resets, or inventory work.

Estimate hours from the work required

Begin with a category that frequently disrupts coverage, such as receiving or markdowns.

Measure the work under normal conditions. Include preparation and completion steps, and collect observations from several relevant stores. Check differences in layout, equipment, experience, and handling requirements before setting a planning assumption.

For volume-driven activities, a simple starting calculation is:

Required labour hours = Work volume × Minutes per unit of work ÷ 60

For example, assume a delivery contains 120 cartons and the agreed planning assumption is four labour minutes per carton:

120 × 4 ÷ 60 = 8 labour hours

That could mean two trained associates working for four hours, subject to space, equipment, and the way the process operates. Eight labour hours describes the combined time required, while elapsed time depends on how the work can be organised.

These figures are illustrative. Actual standards should reflect the retailer’s process and be checked against store experience.

Include fixed preparation or receiving time separately where needed. Also define which steps the per-carton estimate covers so unloading, tagging, or replenishment are counted correctly.

Put the workload on the calendar before approving the schedule

A weekly total tells a manager how much work to accommodate. Timing determines whether it fits.

Give each significant activity an expected duration, required skills, earliest start, and completion deadline. Then compare it with traffic, breaks, role coverage, and other commitments.

Consider a display that requires eight labour hours and must be ready for Friday opening. Two associates scheduled for four hours on Thursday may provide enough time. If both are also expected to cover customers throughout that window, the plan needs another review.

Separate activities according to how much timing flexibility they have:

  • Fixed timing. Work tied to an arrival, opening requirement, or external deadline.

  • Flexible timing. Work that can move within a defined window.

  • Interruptible work. Activities that can pause safely when service demand rises.

  • Work needing continuity. Activities that require an uninterrupted block or a specific setup.

This gives managers a practical basis for adjusting the day when conditions change.

Protect peak coverage by role

Identify the busiest customer windows and check who will actually be available to serve them.

Account for operational assignments, breaks, training, and manager duties. Then check the roles required. A team can have sufficient headcount overall and still lack a trained keyholder, checkout backup, or fitting-room support.

Return to the Saturday example. If six associates are scheduled but three are assigned to task work and one is on break, customer-facing availability is two. The next decision is whether delivery processing can move, markdowns can finish earlier, or breaks can be staggered.

Some operational work must continue during busy periods. Replenishing a bestseller can directly support customers already in the store. Make that assignment deliberate and confirm how the remaining service areas will be covered.

If essential workload and service requirements exceed available hours, escalate the conflict before the shift. Leadership can then decide whether to change scope, timing, process, or labour allocation.

Investigate overruns before resetting the target

An activity taking longer than planned can have several explanations.

The delivery may be larger than forecast. Instructions may be unclear. Materials may be missing. An associate may have been reassigned repeatedly to help customers. The original time allowance may also be too low.

Review the variance with enough context to choose the right response.

Reason for variance

What to review

Possible response

More work than forecast

Actual volume or scope

Update the workload forecast

Repeated service interruptions

Floor demand and available coverage

Move the activity or plan dedicated capacity

Missing materials or information

Readiness before work started

Improve preparation and escalation

Process or training gap

How the task was performed

Provide support or simplify the process

Consistently unrealistic allowance

Comparable stores and observed completion times

Revise the planning assumption

Keep reporting proportionate. Record activity time and major exceptions at a level that helps managers improve the plan.

When actual time is unavailable, be explicit about whether the review uses scheduled, estimated, or recorded hours. Those measures answer different questions.

Review workload and service outcomes together

Reducing non-selling hours may improve a labour report while leaving stock unprocessed or promotional work unfinished. Completing every task can also come at the expense of service if the team is repeatedly pulled away during peak traffic.

Review a balanced set of measures:

  • Planned versus actual activity hours, with workload changes explained.

  • Critical work completed on time and to standard.

  • Selling coverage during peak periods, including role availability.

  • Actual labour hours and spending against plan.

  • Conversion and observed service conditions.

  • Work carried into the next shift or week.

Look for improvement in the operation as a whole. If receiving becomes faster, confirm that stock accuracy and floor availability remain strong. If peak coverage improves, check whether task backlogs are growing elsewhere.

Use store feedback to improve corporate planning

Across a fleet, recurring exceptions can reveal decisions that need to change upstream.

If many stores overrun the same reset allowance, review the setup instructions and estimated workload. If deliveries regularly arrive during peak traffic, involve logistics. If a small format needs more processing time because storage is on another floor, account for that requirement in its planning model.

Ask stores for a short explanation of significant variances, then tell them what changed as a result. That makes feedback part of planning and gives managers a reason to report problems early.

Start with one activity, validate the assumptions, and expand once teams can use the model reliably.

How StoreForce supports labour and workload planning

StoreForce helps retailers align schedules with customer traffic, sales demand, and labour targets. Peak coverage reporting and performance visibility help leaders review whether staffing is positioned around the periods with the greatest selling opportunity.

[Explore StoreForce Labour Optimisation]

Bringing task management into the same operational environment helps teams consider upcoming work alongside the schedule. The planning conversation can cover both what must be completed and who will remain available for customers.

Bring a week with recurring delivery overruns or weak peak coverage to a StoreForce demo. Walk through the workload, timing, and staffing decisions to see where greater visibility could improve the plan.

Book a StoreForce demo to explore how your teams can coordinate store work and customer demand more effectively.

See How StoreForce Can Work for Your Stores

Book a quick chat with us today, to improve your retail operations tomorrow.

Speak To A Retail Expert